- Highly motivated Amn! White Space 12 7.2 Community (non-duty related) Bullets 12 7.3 Wraparounds 12 7.4 Fluffy Say-Nothing Bullets 12 … google_ad_type = "image"; - Spt'd UK insurance insp/pressure vessel rqmts; restored 200 inoperative units--boosted eqpt avail/ready stock by 25% Analyzes work activities to ensure quality and compliance with policies, current directions, and other publications. - Honed multi-craft skills; crushed 80-hr equip mx ops/snow crs--cleared snow ### sq ft parking lot/356 deliveries, - ID'd acft mx eqpmt flaw; rerouted pwr 400Hz frequency converter--msn critical mx $20M acft/1.4K sorties sustained - Trained electric shop on digger, derrick, and line trucks--saved $110K and completed-mission critical project - Supported B2600 transformer repairs; provided generator support during outage--restored operations 100% <8 hours - Renovat'd vehicle mx roof; replaced 6,300 square feet(sqft) roofing material--safeguarded over $10K of assets - Managed 3 psnl; installed new door & hardware at Shiloh dorm--eliminated occupant safety/security concern Performance in Primary Duties. - Expert locksmith; replac'd 66 locks/keys for FSS dorm--provid'd state-of-the-art rm security sys for residents, - Facilitated Ops Engn crs; secured 40 hrs/trained 10 sec psnl--spt'd 1.3K facs worth $5.7M/30 CEUs rewarded - Exceptional leader; directed stage set-up/tear dwn for 20+ Change of Command's--followed military tradition destruction procedures. Categories: Leadership,Management Ability. google_ad_type = "text_image"; EPR Bullets - Each bullet needs to be written to show an action/accomplishment linked to a result/impact. - Led FBO build-up; placed 8.8K studs/finished 40K sq ft of sheet rock--bolstered safe work environment f/50 AP psnl - Worked urgent hanger roof repair; fabricat'd/install'd 270 linear foot gutter sys--protected F-16 mx equipment, - Supervises X Amn; maintains/installs/inspects/repairs XXX mis of HV elec distr sys's ISO $XXB plane fleet/XXX msns Additional Duties EPR Bullets. //2007-04-30: afeprbullets - Expanded SF mx facility; repositioned 3 walls/replaced 5 doors/locking sys--increased workspace by 200 sqft - Key mbr w/RHS ductwork and ceiling install; increased a/c efficiency--completed two wks ahead of schedule - Restor'd pilot trng; opened USAFWC vault door/repaired X09 lock sys--completed <3 hrs w/zero msn impact - Rectifi'd security issue at Nellis Clubs; re-keyed 50 locks in 2 facilities--praised by Club mgt--promote now I apologize; it's EPR season for this TSgt and I have 3 (S)Sgt EPRs I'm working on, not too long after submitting my own EPR and a few annual award packages. - Piloted prefab efforts of 52 trusses for FOL Normandy nine days early--allowed for on-time TOC completion The action/accomplishment covers what they did (and the significance if it’s not immediately or intuitively clear). ctxt_ad_bc = "FFFFFF"; - Org'd PEB site-prep; mng'd 18 Amn/excavat'd 624 ln ft/spread 8 ton of rock--compl'd 5K sq ft storage fac foundation, - Part of 3 mbr crew; completed 513 DSWs in 5 months; secured 899 facilities--attained 95% completion rate - Structures contingency project rep; convert'd shed to ADPE storage--provided storage for $232K in equipment - Transformed safety prgm; dedicated 30 hrs/remedied sections 6 yr deficiency--ensured compliance w/AF requirement, - Updated Child Dev Cntr exit doors; modified eight panic hardware systems--eliminated DoD safety violations - Restored tornado-damaged electrical services to Fayetteville, TN school; life changing recovery for children Consistently exceeds expectations & leads by example; ready for SSgt--promote now - Key Player; skillfully erected/secured steel beams-$730k RHS sup.whse.-safeguarded $22m in contngcy assets - Repaired damaged dorm pavilions; repaired/re-shingled 800 square feet--restored utilization for 900 residents - Repaired floor at LRS vehicle ops bldg; replaced 1K sq ft of tile--eliminated safety haz/enhanced aesthetics Terms and Conditions of Use. - On track with career progression; executed CDCs according to trng schedule--maintained 90% average on tests - Managed 8 man crew; repaired & painted 5 unoccupied housing units--converted to officer TLF in just 10 days - Upgraded HVAC sys; designed/fabricat'd 300 ft ductwork/installed vents--saved $50K energy/contractor cost All I see is bullets. - Led Kinley TLF conversion; installed $36K doors/windows--transformed 13 units 2 weeks prior to rqst'd date - Executed $73K repl project; id'd/insp 4 dorms/136 obsolete lighting--upheld QoL/negated health & safety risk f/Amn - Repair'd two damaged dorm pavilions; re-shingled/re-sheathed 800 sqft--restor'd utilization for 900 residents - Supported Air Traffic Control msn; installed 1K sqft waterproof membrane--protected $135K ATC equipment - Restored 57 MXS security; re-keyed 35 hanger doorways--ensured 100% accountability; protected vital parts - Upgrad'd cryogenics security; placed 750+ ln ft of block/ 150+ yds concrete--secur'd cryogenics tanks & carts - Assisted w/exit upgrades; replaced 9 lock sys--secured $80M Jt Terminal Attack Ctrl Cntr--promote on time! - Led RWP insp; examined 25 fixed roof ladders--ID'd 5 OSHA concerns/prevented severe injury to mx prsnl The result of the action and its should show the impact of … - Assist'd with GREEN FLAG exit upgrades; rpl'd 9 lock systems--secur'd $80M Jt Terminal Attack Ctrl Cntr Categories: Accuracy,Competency,Custodian,Development,General Job Skills,Innovation,Organizational Skills,Organizing,Cost Savings. Facility Security Officer, COMSEC Custodian The Boeing Company - Colorado Springs, CO.. Collaborates with engineer and environmental Filled in as DFAC manager while manager TDY; supervised 8 US/13 LN staff during absence--operational lifesaver, - Logistical expert; spearheaded relocation of linen exchange operation, current facility scheduled for demolition, Connected 60 kilowatt generator and heaters for VM facility--stopped lengthy delays supporting mission ops, - Outstanding manager; supervised servicing of $11M in support equipment--achieved 98% in-commission rate, - Functional Area Records Manager--managed XX file plans--all approved and in compliance during rotation, Eqmpt calibration pgm manager; designed first-ever all inclusive tracking device; $700K assets accounted for. To me, it is no longer just a venue for EPR bullets. - Trained 30 prsnl lock out/tag out pgm; taught sys mx/safety procedures--shop 100% compliant w/OSHA stds - Assisted with completion of 330 work requests--earned two time Operations Flight 'Shop of the Month' award, - Bolster'd cryogenics storage upgrade; placed 750 sqft concrete/300 block--secured $85K oxygen/nitrogen tank Service Specialty Qualifications . amazon_ad_tag = "fromtheinsi0d-20"; amazon_ad_width = "160"; amazon_ad_height = "600"; amazon_ad_link_target = "new"; amazon_color_link = "3356FF";//-->, ,